NEW QUESTION # 13
Consider the following examples of risks identified in different software development projects:
[I]. The contrast color ratio for both normal text and large text of a website does not comply with the applicable accessibility guidelines, making itdifficult for many users to read the content on the pages
[II]. A development vendor fails to deliver their software system on time, causing significant delays to system integration testing activities that havebeen planned as part of a development project for a system of systems
[III]. People in the test team do not have sufficient skills to automate tests at the test levels required by the test automation strategy which does notallow production of an effective regression test suite
[IV]. In a web application, data from untrusted sources is not subject to proper input validation, making the applicationvulnerable to several securityattacks Which of the following statements is true?
- A. [IV] is a product risk; [I]. [II] and [III] are project risks
- B. [I] and [III] are product risks; [II] and [IV] are project risks
- C. [I] and [IV] are product risks. [II] and [III] are project risks
- D. [II], [III] and [IV] are product risks; [I] is a project risk
Answer: C
Explanation:
Explanation
This answer is correct because product risks are risks that affect the quality of the software product, such as defects, failures, or non-compliance with requirements or standards. Project risks are risks that affect the project's schedule, budget, resources, or scope, such as delays, cost overruns, skill gaps, or scope changes. In this case, [I] and [IV] are product risks, as they relate to the accessibility and security of the software product, which are quality attributes. [II] and [III] are project risks, as they relate to the delivery time and the test automation skills of the test team, which are project factors. References: ISTQB Glossary of Testing Terms v4.0, ISTQB Foundation Level Syllabus v4.0, Section 2.1.1.1
NEW QUESTION # 14
Consider a given test plan which, among others, contains the following three sections: "Test Scope", "Testing Communication", and "Stakeholders". The features of the test object to be tested and those excluded from the testing represent information that is:
- A. usually included in a test plan and, in the given test plan, it is more likely to be specified within "Test Scope" rather than in the other two sections mentioned
- B. not usually included in a test plan, and therefore in the given test plan it should not be specified neither within the three sections mentioned, nor within the others
- C. usually included in a test plan and, in the given test plan, it is more likely to be specified within "Testing Communication" rather than in the other two sections mentioned
- D. usually included in a test plan and, in the given test plan, it is more likely to be specified within
"Stakeholders" rather than in the other two sections mentioned
Answer: A
Explanation:
Explanation
The features of the test object to be tested and those excluded from the testing represent information that is usually included in a test plan and, in the given test plan, it is more likely to be specified within "Test Scope" rather than in the other two sections mentioned. The test scope defines the boundaries and limitations of the testing activities, such as the test items, the features to be tested, the features not to be tested, the test objectives, the test environment, the test resources, the test assumptions, the test risks, etc. The test scope helps to establish a common understanding of what is included and excluded from the testing, and to avoid ambiguity, confusion, or misunderstanding among the stakeholders. The other two sections, "Testing Communication" and "Stakeholders", are also important parts of a test plan, but they do not directly address the features of the test object. The testing communication describes the methods, frequency, and responsibilities for the communication and reporting of the testing progress, status, issues, and results. The stakeholders identify the roles and responsibilities of the people involved in or affected by the testing activities, such as the test manager, the test team, the project manager, the developers, the customers, the users, etc. References: ISTQB Certified Tester Foundation Level (CTFL) v4.0 sources and documents:
ISTQB Certified Tester Foundation Level Syllabus v4.0, Chapter 2.1.1, Test Planning1 ISTQB Glossary of Testing Terms v4.0, Test Plan, Test Scope2
NEW QUESTION # 15
Which of the following is a task the Author is responsible for, as part of a typical formal review?
- A. Determining the people who will be involved in the review
- B. Identifying potential anomalies in the work product under review
- C. Recording the anomalies found during the review meeting
- D. Fixing the anomalies found in the work product under review
Answer: B
Explanation:
Explanation
This answer is correct because identifying potential anomalies in the work product under review is one of the tasks the Author is responsible for, as part of a typical formal review. The Author is the person who creates the work product to be reviewed, such as a requirement specification, a design document, or a test case. The Author's tasks include preparing the work product for the review, identifying potential anomalies in the work product, and fixing the anomalies found in the work product after the review. References: ISTQB Glossary of Testing Terms v4.0, ISTQB Foundation Level Syllabus v4.0, Section 2.4.2.1
NEW QUESTION # 16
A typical objective of testing is to ensure that:
- A. testing is used to drive the development of a software
- B. a software has been properly covered
- C. there are no defects in a software that is about to be released
- D. a software has been tested using a combination of test techniques
Answer: D
Explanation:
Explanation
This answer is correct because a typical objective of testing is to ensure that a software has been tested using a combination of test techniques, such as black-box, white-box, or experience-based techniques, that are appropriate for the test objectives, test levels, and test types. Testing using a combination of test techniques can increase the effectiveness and efficiency of testing, as different techniques can target different aspects of the software quality, such as functionality, usability, performance, security, reliability, etc. Testing using a combination of test techniques can also reduce the risk of missing defects that could be detected by one technique but not by another. References: ISTQB Foundation Level Syllabus v4.0, Section 2.3.1.1, Section
2.3.2
NEW QUESTION # 17
Consider a review for a high-level architectural document written by a software architect. The architect does most of the review preparation work, including distributing the document to reviewers before the review meeting. However, reviewers are not required to analyze the document in advance, and during the review meeting the software architect explains the document step by step. The only goal of this review is to establish a common understanding of the software architecture that will be used in a software development project.
Which of the following review types does this review refer to?
- A. Inspection
- B. Informal review
- C. Walkthrough
- D. Audit
Answer: C
Explanation:
Explanation
This answer is correct because a walkthrough is a type of review where the author of the work product leads the review process and explains the work product to the reviewers. The reviewers are not required to prepare for the review in advance, and the main objective of the walkthrough is to establish a common understanding of the work product and to identify any major defects or issues. A walkthrough is usually informal and does not follow a defined process or roles. In this case, the review for a high-level architectural document written by a software architect matches the characteristics of a walkthrough. References: ISTQB Glossary of Testing Terms v4.0, ISTQB Foundation Level Syllabus v4.0, Section 2.4.2.2
NEW QUESTION # 18
Which of the following statements about the value of maintaining traceability between the test basis and test work products is not true?
- A. Traceability can be useful for assessing the impact of a change to a test basis item on the corresponding tests
- B. Traceability can be useful for determining the most suitable test techniques to be used in a testing project
- C. Traceability can be useful to support the needs required by the auditing of testing
- D. Traceability can be useful for determining how many test basis items are covered by the corresponding tests
Answer: B
Explanation:
Explanation
Traceability is the ability to trace the relationships between the items of the test basis, such as the requirements, the design, the risks, etc., and the test artifacts, such as the test cases, the test results, the defects, etc. Traceability can provide various benefits for the testing process, such as improving the test coverage, the test quality, the test efficiency, and the test communication. However, not all the statements given are true about the value of maintaining traceability between the test basis and test work products. The statement that is not true is option C, which says that test objectives should be the same for all test levels, although the number of tests designed at various levels can vary significantly. This statement is false, because test objectives are the goals or the purposes of testing, which can vary depending on the test level, the test type, the test technique, the test environment, the test stakeholder, etc. Test objectives can be defined in terms of the test basis, the test coverage, the test quality, the test risk, the test cost, the test time, etc. Test objectives should be specific, measurable, achievable, relevant, and time-bound, and they should be aligned with the project objectives and the quality characteristics. Test objectives should not be the same for all test levels, as different test levels have different focuses, scopes, and perspectives of testing, such as component testing, integration testing, system testing, and acceptance testing. The other statements are true about the value of maintaining traceability between the test basis and test work products, such as:
Traceability can be useful for assessing the impact of a change to a test basis item on the corresponding tests: This statement is true, because traceability can help to identify which tests are affected by a change in the test basis, such as a new requirement, a modified design, a revised risk, etc., and to determine thenecessary actions to update, re-execute, or re-evaluate the tests. Traceability can also help to estimate the effort, the cost, and the time needed to implement the change and to verify its impact on the software system.
Traceability can be useful for determining how many test basis items are covered by the corresponding tests: This statement is true, because traceability can help to measure the test coverage, which is the degree to which the test basis is exercised by the test cases. Traceability can help to identify which test basis items are covered, partially covered, or not covered by the tests, and to evaluate the adequacy, the completeness, and the effectiveness of the testing process. Traceability can also help to identify the gaps, the overlaps, or the redundancies in the test coverage, and to prioritize, optimize, or improve the test cases.
Traceability can be useful to support the needs required by the auditing of testing: This statement is true, because traceability can help to provide evidence, documentation, and justification for the testing activities, results, and outcomes. Traceability can help to demonstrate that the testing process follows the standards, the regulations, the policies, and the best practices that are applicable to the software system, the project, or the organization. Traceability can also help to verify that the testing process meets the expectations, the needs, and the satisfaction of the users and the stakeholders. References: ISTQB Certified Tester Foundation Level (CTFL) v4.0 sources and documents:
ISTQB Certified Tester Foundation Level Syllabus v4.0, Chapter 1.2.2, Testing Policies, Strategies, and Test Approaches1 ISTQB Certified Tester Foundation Level Syllabus v4.0, Chapter 2.1.1, Test Planning1 ISTQB Certified Tester Foundation Level Syllabus v4.0, Chapter 2.1.2, Test Monitoring and Control1 ISTQB Certified Tester Foundation Level Syllabus v4.0, Chapter 2.1.3, Test Analysis and Design1 ISTQB Glossary of Testing Terms v4.0, Traceability, Test Basis, Test Artifact, Test Objective, Test Level, Test Coverage, Test Quality, Test Risk, Test Cost, Test Time2
NEW QUESTION # 19
The fact that defects are usually not evenly distributed among the various modules that make up a software application, but rather their distribution tend to reflect the Pareto principle:
- A. is expressed by the testing principle referred to as Tests wear out'
- B. is a false myth
- C. is expressed by the testing principle referred to as 'Bug prediction'
- D. is expressed by the testing principle referred to as 'Defects cluster together'
Answer: D
Explanation:
Explanation
The fact that defects are usually not evenly distributed among the various modules that make up a software application, but rather their distribution tend to reflect the Pareto principle, is expressed by the testing principle referred to as 'Defects cluster together'. This principle states that a small number of modules contain most of the defects detected, or that a small number of causes are responsible for most of the defects. This principle can be used to guide the test analysis and design activities, by prioritizing the testing of the most critical or risky modules, or by applying more rigorous test techniques to them. Therefore, option C is the correct answer.
References: ISTQB Certified Tester Foundation Level Syllabus v4.01, Section 1.2.1, page 11; ISTQB Glossary v4.02, page 16.
NEW QUESTION # 20
Which of the following statements is true?
- A. Bugs are defects found during component testing, while failures are defects found at higher test levels
- B. A defect does not always produce a failure, while a bug always produces a failure
- C. Failures can be caused by defects, but also by environmental conditions
- D. A defect may cause a failure which, when occurring, always causes an error
Answer: C
Explanation:
Explanation
Failures can be caused by defects, but also by environmental conditions. A failure is an event in which the software system does not perform a required function or performs a function incorrectly, according to the expected behavior. A defect is a flaw in the software system or a deviation from the requirements or the specifications, that may cause a failure. However, not all failures are caused by defects, as some failures may be caused by environmental conditions, such as hardware malfunctions, network interruptions, power outages, incompatible configurations, etc. Environmental conditions are factors that affect the operation of the software system, but are not part of the software system itself. The other statements are false, because:
A defect does not always produce a failure, while a bug always produces a failure. This statement is false, because a defect may or may not produce a failure, depending on the inputs, the outputs, the states, or the scenarios of the software system, and a bug is just another term for a defect, so it has the same possibility of producing a failure as a defect. For example, a defect in a rarely used feature or a hidden branch of the code may never produce a failure, while a defect in a frequently used feature or a critical path of the code may produce a failure often. A bug is not a different concept from a defect, but rather a synonymor a colloquial term for a defect, so it has the same definition and implications as a defect.
A defect may cause a failure which, when occurring, always causes an error. This statement is false, because an error is not a consequence of a failure, but rather a cause of a defect. An error is a human action or a mistake that produces a defect in the software system, such as a typo, a logic flaw, a requirement misunderstanding, etc. An error is not observable in the software system, but rather in the human mind or the human work products, such as the code, the design, the documentation, etc. A failure is not a cause of an error, but rather a result of a defect, which is a result of an error. For example, an error in the code may cause a defect in the software system, which may cause a failure in the software behavior.
Bugs are defects found during component testing, while failures are defects found at higher test levels.
This statement is false, because bugs and failures are not different types of defects, but rather different terms for defects and their manifestations. As mentioned before, bugs are just another word for defects, and failures are the events in which the software system does not perform as expected due to defects.
Bugs and failures can be found at any test level, not only at component testing or higher test levels. Test levels are the stages of testing that correspond to the levels of integration of the software system, such as component testing, integration testing, system testing, and acceptance testing. Defects and failures can occur and be detected at any test level, depending on the test objectives, the test basis, the test techniques, and the test environment. References: ISTQB Certified Tester Foundation Level (CTFL) v4.0 sources and documents:
ISTQB Certified Tester Foundation Level Syllabus v4.0, Chapter 1.1.2, Testing and Quality1 ISTQB Certified Tester Foundation Level Syllabus v4.0, Chapter 1.2.1, Testing Principles1 ISTQB Certified Tester Foundation Level Syllabus v4.0, Chapter 1.3.1, Testing in Software Development Lifecycles1 ISTQB Glossary of Testing Terms v4.0, Failure, Defect, Bug, Environmental Condition, Error, Test Level2
NEW QUESTION # 21
The whole-team approach:
- A. is mostly adopted in projects aimed at developing safety-critical systems, as it ensures the highest level of testing independence
- B. promotes the idea that all team members should be responsible for the quality of the product
- C. promotes the idea that all team members should have a thorough understanding of test techniques
- D. is a consensus-based approach that engages the whole team in estimating the user stories
Answer: B
Explanation:
Explanation
This answer is correct because the whole-team approach is a way of working in agile projects where all team members share the responsibility for the quality of the product, and collaborate on delivering value to the customer. The whole-team approach involves testers, developers, business analysts, product owners, and other stakeholders in planning, designing, developing, testing, and delivering the product. The whole-team approach fosters communication, feedback, learning, and continuous improvement within the team. References: ISTQB Glossary of Testing Terms v4.0, ISTQB Foundation Level Syllabus v4.0, Section 3.1.1.1
NEW QUESTION # 22
Which of the following is a test-first approach, where tests that express a shared understanding from stakeholders of how the application is expected to work, are first written in business-readable language (following the Given/When/Then format), and then made executable to drive development?
- A. Test-Driven Development (TDD)
- B. Behavior-Driven Development (BDD)
- C. Acceptance Test-Driven Development (ATDD)
- D. Domain-Driven Design (DDD)
Answer: B
Explanation:
Explanation
This answer is correct because Behavior-Driven Development (BDD) is a test-first approach, where tests that express a shared understanding from stakeholders of how the application is expected to work, are first written in business-readable language (following the Given/When/Then format), and then made executable to drive development. BDD is a collaborative approach that involves testers, developers, business analysts, product owners, and other stakeholders in defining the expected behavior of the application using scenarios that describe the preconditions, actions, and outcomes of the application. BDD scenarios are written using a domain-specific language (DSL) that can be translated into executable test cases using tools such as Cucumber or SpecFlow. BDD aims to improve communication, collaboration, and feedback among the team members, and to deliver software that meets the customer's needsand expectations. References: ISTQB Glossary of Testing Terms v4.0, ISTQB Foundation Level Syllabus v4.0, Section 3.1.1.4
NEW QUESTION # 23
The following rules determine the annual bonus to be paid to a salesman of a company based on the total annual amount of the sales made (referredto as TAS).
If the TAS is between 50k€ and 80k€, the bonus is 10%. If the TAS exceeds 80k€ by a value not greater than
40k€, the bonus is 15%. Finally, if the TAS
exceeds the maximum threshold which entitles to a 15% bonus, the bonus is 22%.
Consider applying equivalence partitioning to the TAS (Note: 1k€ = 1000 euros).
Which one of the following answers contain only test cases that belong to the same equivalence partition?
- A. TC1 = 79k€; TC2= 80k€; TC3=81k€; TC4=82k€
- B. TC1 = 40k€; TC2= 46k€; TC3=51k€; TC4=53k€
- C. TC1 = 90k€; TC2= 110k€; TC3=125k€: TC4=140k€
- D. TC1 = 81 k€; TC2= 97k€; TC3=111k€; TC4=118k€
Answer: D
Explanation:
Explanation
This answer is correct because equivalence partitioning is a test design technique that divides the input domain of a system or component into partitions of equivalent data, such that each partition is expected to produce the same output or behavior. Equivalence partitioning aims to reduce the number of test cases by selecting one representative value from each partition. In this case, the input domain of the TAS can be divided into four partitions based on the bonus rules: less than 50k€, between 50k€ and 80k€, between 80k€ and 120k€, and more than 120k€. The test cases in the answer belong to the same partition, which is between 80k€ and 120k€, and they are expected to produce the same output, which is a bonus of 15%. References: ISTQB Glossary of Testing Terms v4.0, ISTQB Foundation Level Syllabus v4.0, Section 2.3.2.1
NEW QUESTION # 24
For each of the test cases to be executed, the following table specifies the priority order and dependencies on other test cases
Which of the following test execution schedules is compatible with the logical dependencies and allows executing the test cases in priority order?
- A. TC4, TC6, TC3, TC2, TC5, TC1
- B. TC3, TC5, TC6, TC1, TC4, TC3
- C. TC4, TC3,TC2,TC6,TC1,TC5
- D. TC4, TC3, TC2, TC6, TC5. TC1
Answer: C
Explanation:
Explanation
This answer is correct because it follows the logical dependencies and allows executing the test cases in priority order. TC4, TC3, and TC2 are executed first because they have the highest priority. TC6 is executed next because it has a logical dependency on TC2. TC1 is executed next because it has a logical dependency on TC5. Finally, TC5 is executed last because it has the lowest priority. References: ISTQB Certified Tester Foundation Level (CTFL) v4.0 documents
NEW QUESTION # 25
Following a risk-based testing approach you have designed 10 tests to cover a product risk with a high-risk level. You want to estimate, adopting the three-point test estimation technique, the test effort required to reduce the risk level to zero by executing those 10 tests. You made the following three initial estimates:
* most optimistic = 6 person hours
* most likely = 30 person hours
* most pessimistic = 54 person hours
Based only on the given information, which of the following answers about the three-point test estimation technique applied to this problem is true?
- A. The final estimate is exactly 30 person hours because the technique uses the arithmetic mean of the three initial estimates as the final estimate
- B. The final estimate is between 22 person hours and 38 person hours
- C. The final estimate is exactly 30 person hours because the technique uses the initial most likely estimate as the final estimate
- D. The final estimate is between 6 person hours and 54 person hours
Answer: B
Explanation:
Explanation
The three-point test estimation technique is a method of estimating the test effort based on three initial estimates: the most optimistic, the most likely, and the most pessimistic. The technique uses a weighted average of these three estimates to calculate the final estimate, which is also known as the expected value. The formula for the expected value is:
Expected value = (most optimistic + 4 * most likely + most pessimistic) / 6 Using the given values, the expected value is:
Expected value = (6 + 4 * 30 + 54) / 6 Expected value = 30 person hours However, the expected value is not the only factor to consider when estimating the test effort. The technique also calculates the standard deviation, which is a measure of the variability or uncertainty of the estimates. The formula for the standard deviation is:
Standard deviation = (most pessimistic - most optimistic) / 6
Using the given values, the standard deviation is:
Standard deviation = (54 - 6) / 6 Standard deviation = 8 person hours
The standard deviation can be used to determine a range of possible values for the test effort, based on a certain level of confidence. For example, using a 68% confidence level, the range is:
Expected value ± standard deviation
Using the calculated values, the range is:
30±8 person hours
Therefore, the final estimate is between 22 person hours and 38 person hours, which is option A.
References: ISTQB Certified Tester Foundation Level Syllabus v4.01, Section 2.3.2, page 24-25; ISTQB Glossary v4.02, page 33.
NEW QUESTION # 26
Which of the following statements about white-box test techniques is true?
- A. Branch coverage is the most thorough code-related white-box test technique, and therefore applicable standards prescribe achieving full branch coverage at the highest safety levels for safety-critical systems
- B. Achieving full statement coverage and full branch coverage for a software product means that such software product has been fully tested and there are no remaining bugs within the code
- C. Code-related white-box test techniques provide an objective measure of coverage and can be used to complement black-box test techniques to increase confidence in the code
- D. Code-related white-box test techniques are not required to measure the actual code coverage achieved by black-box testing, as code coverage can be measured using the coverage criteria associated with black-box test techniques
Answer: C
Explanation:
Explanation
This answer is correct because code-related white-box test techniques are test design techniques that use the structure of the code to derive test cases. They provide an objective measure of coverage, such as statement coverage, branch coverage, or path coverage, which indicate how much of the code has been exercised by the test cases. Code-related white-box test techniques can be used to complement black-box test techniques, which are test design techniques that use the functional or non-functional requirements of the system or component to derive test cases. By combining both types of techniques, testers can increase their confidence in the code and find more defects. References: ISTQB Glossary of Testing Terms v4.0, ISTQB Foundation Level Syllabus v4.0, Section 2.3.2.2
NEW QUESTION # 27
Which of the following statements about exploratory testing is true?
- A. When exploratory testing is conducted following a session-based approach, the issues detected by the testers can be documented in session sheets
- B. In exploratory testing, testers usually produce scripted tests and establish bidirectional traceability between these tests and the items of the test basis
- C. Exploratory testing is an experience-based test technique used by testers during informal code reviews to find defects by exploring the source code
- D. Exploratory testing is an experience-based test technique in which testers explore the requirements specification to detect non testable requirements
Answer: A
Explanation:
Explanation
Exploratory testing is an experience-based test technique in which testers dynamically design and execute tests based on their knowledge, intuition, and learning of the software system, without following predefined test scripts or test cases. Exploratory testing can be conducted following a session-based approach, which is a structured way of managing and measuring exploratory testing. In a session-based approach, the testers perform uninterrupted test sessions, usually lasting between 60 and 120 minutes, with a specific charter or goal, and document the issues detected, the test coverage achieved, and the time spent in session sheets.
Session sheets are records of the test activities, results, and observations during a test session, which can be used for reporting, debriefing, and learning purposes. The other statements are false, because:
Exploratory testing is not a test technique in which testers explore the requirements specification to detect non testable requirements, but rather a test technique in which testers explore the software system to detect functional and non-functional defects, as well as to learn new information, risks, or opportunities. Non testable requirements are requirements that are ambiguous, incomplete, inconsistent, or not verifiable, which can affect the quality and effectiveness of the testing process. Non testable requirements can be detected by applying static testing techniques, such as reviews or inspections, to the requirements specification, before the software system is developed or tested.
Exploratory testing is not a test technique used by testers during informal code reviews to find defects by exploring the source code, but rather a test technique used by testers during dynamic testing to find defects by exploring the behavior and performance of the software system, without examining the source code. Informal code reviews are static testing techniques, in which the source code is analyzed by one or more reviewers, without following a formal process or using a checklist, to identify defects, violations, or improvements. Informal code reviews are usually performed by developers or peers, not by testers.
In exploratory testing, testers usually do not produce scripted tests and establish bidirectional traceability between these tests and the items of the test basis, but rather produce unscripted tests and adapt them based on the feedback and the findings of the testing process. Scripted tests are tests that are designed and documented in advance, with predefined inputs, outputs, and expected results, and are executed according to a test plan or a test procedure. Bidirectional traceability is the ability to trace both forward and backward the relationships between the items of the test basis, such as the requirements, the design, therisks, etc., and the test artifacts, such as the test cases, the test results, the defects, etc.
Scripted tests and bidirectional traceability are usually associated with more formal and structured testing approaches, such as specification-based or structure-based test techniques, not with exploratory testing. References: ISTQB Certified Tester Foundation Level (CTFL) v4.0 sources and documents:
ISTQB Certified Tester Foundation Level Syllabus v4.0, Chapter 2.2.3, Experience-based Test Design Techniques1 ISTQB Glossary of Testing Terms v4.0, Exploratory Testing, Session-based Testing, Session Sheet, Non Testable Requirement, Static Testing, Informal Review, Dynamic Testing, Scripted Testing, Bidirectional Traceability2
NEW QUESTION # 28
Which of the following is a test task that usually occurs during test implementation?
- A. Archive the testware for use in future test projects
- B. Make sure the planned test environment is ready to be delivered
- C. Gather the metrics that are used to guide the test project
- D. Find, analyze, and remove the causes of the failures highlighted by the tests
Answer: B
Explanation:
Explanation
A test task that usually occurs during test implementation is to make sure the planned test environment is ready to be delivered. The test environment is the hardware and software configuration on which the tests are executed, and it should be as close as possible to the production environment where the software system will operate. The test environment should be planned, prepared, and verified before the test execution, to ensure that the test conditions, the test data, the test tools, and the test interfaces are available and functional. The other options are not test tasks that usually occur during test implementation, but rather test tasks that occur during other test activities, such as:
Find, analyze, and remove the causes of the failures highlighted by the tests: This is a test task that usually occurs during test analysis and design, which is the activity of analyzing the test basis, designing the test cases, and identifying the test data. During this activity, the testers can use techniques such as root cause analysis, defect prevention, or defect analysis, to find, analyze, and remove the causes of the failures highlighted by the previous tests, and to prevent or reduce the occurrence of similar failures in the future tests.
Archive the testware for use in future test projects: This is a test task that usually occurs during test closure, which is the activity of finalizing and reporting the test results, evaluating the test process, and identifying the test improvement actions. During this activity, the testers can archive the testware, which are the test artifacts produced during the testing process, such as the test plan, the test cases, the test data, the test results, the defect reports, etc., for use in future test projects, such as regression testing, maintenance testing, or reuse testing.
Gather the metrics that are used to guide the test project: This is a test task that usually occurs during test monitoring and control, which is the activity of tracking and reviewing the test progress, status, and quality, and taking corrective actions when necessary. During this activity, the testers can gather the metrics, which are the measurements of the testing process, such as the test coverage, the defect density, the test effort, the test duration, etc., that are used to guide the test project, such as planning, estimating, scheduling, reporting, or improving the testing process. References: ISTQB Certified Tester Foundation Level (CTFL) v4.0 sources and documents:
ISTQB Certified Tester Foundation Level Syllabus v4.0, Chapter 2.1.1, Test Planning1 ISTQB Certified Tester Foundation Level Syllabus v4.0, Chapter 2.1.2, Test Monitoring and Control1 ISTQB Certified Tester Foundation Level Syllabus v4.0, Chapter 2.1.3, Test Analysis and Design1 ISTQB Certified Tester Foundation Level Syllabus v4.0, Chapter 2.1.4, Test Implementation1 ISTQB Certified Tester Foundation Level Syllabus v4.0, Chapter 2.1.5, Test Execution1 ISTQB Certified Tester Foundation Level Syllabus v4.0, Chapter 2.1.6, Test Closure1 ISTQB Glossary of Testing Terms v4.0, Test Environment, Test Condition, Test Data, Test Tool, Test Interface, Failure, Root Cause Analysis, Defect Prevention, Defect Analysis, Testware, Regression Testing, Maintenance Testing, Reuse Testing, Test Coverage, Defect Density, Test Effort, Test Duration2
NEW QUESTION # 29
......